The installation of asphalt roads need to have a strong and durable base or else this could contribute to its low life span and risk for cracks and damages. This is a huge financial investment and the contractor should be able to give quality materials and procedures for paving the surface. It consists of a lot of steps which includes the removal of old structure and then applying the new one.

The base must be the strongest and most compact structure in the whole installation. So, before placing and pouring the asphalt paving Los Angeles, you need to make sure that the sub base is as hard as a rock to prevent it from shifting or moving. This causes those cracks that are usually seen on cheaply done pavements.

The first part would be taking out and removing all the unwanted soil and other materials that are on the ground. There should be about a foot deep of excavation and any soft soil, loam, and stumps should be taken out as well. Never ever try to put the final mixture on top of concrete or cement since the sub base is questionable.

The next step would be base and grading where the proper installation of materials beneath the asphalt should be placed. This determines the overall foundation of the pavement and also with its durability. Place about four inches to six inches of crushed concrete or asphalt millings.

These are engineered specifically to be a layer beneath the installation which is usually being spread by a skidrow. Grading properly makes it easier for the asphalt to be applied. When necessary, use a transit or laser level to make sure of the pitch for water flow direction. The base is then rolled using a vibratory roller for every two to three inches until the right thickness is achieved.

It is then layered into two levels of hot pavement mixtures. The mixtures should be delivered fresh and hot from the plant to make sure it can be applied right away. This is true for parking lots and is only one layer for driveways.

This is also called a lift, and what the first one does is that it stabilizes the base course and this consists of large stones with greater hardness. In the second lift or layer, the stones here are smaller and finer. This makes the top layer to be smoother and gives a clean and finished look.

Compression should be done again in order to make this compact and solidified. A vibratory drum roller is used to even out the surface and compact it as well. Also, the edges should be sloped to about forty five degrees which is already enough to support weight and movement from vehicles.

The cut should always be in this way which is a diamond cut. This is in order for it to meet flush underground for these two surfaces. Just to make sure, you have to have this skim coated to make the layers thin over the edges. This makes the snowplows to lift them up but it is still too thin to support enough weight.