Methods That St Augustine HVAC Repairs And Fixation Services Employ To Fix Your Equipment

By Domingo Townsend


Installing HVAC requires understanding more about the system and its activities. It is a cooling and heating system that is developed to fitting structures. Many designers go for this system since it provides a comfortable environment. Here are steps involved in St Augustine HVAC repairs and installation services.

First and foremost, you should know a total load of your house. This is an important process as it guides on the size of the system that you will purchase. There are software provided online which can help in working out the calculation. There are several benefits that are provided by going for the right size of the system. One of them is that your room will be effectively cooled.

Take your time to look at the area where the fan coil unit should be located. Garage and attics are suitable for the location. However, you should ensure the location is free from any environmental aspects. Closed areas such as a basement, closet, and utility rooms are also good for the fan location. The fan units are available in two major categories such as horizontal and vertical systems.

Choose an appropriate site for return air opening. You should not install the return air duct in the kitchen, living room or dining room. The fan can pass in the opening where a cut is made depending on the dimensions and size of the return air duct.

Platform construction is another important step that should be undertaken. The size of the fan coil will affect the size of the platform. When constructing the platform, you should use plywood measuring half an inch. Applying the isolation strips that are provided with the system will help in increasing its performance. You should suspend your fan coil. The fan coil and the rod should not be directly connected.

Below the fan coil unit, the supply plenum ring should be placed. To acquire space for the plenum ring, you should move the fan coil towards the periphery of the platform. The ring gasket should be attached to the fan coil before locating it in supply plenum ring. There should be an attachment of the condensate drain to the fan coil. You should pay attention to the instructions that come with the condensate drain. Connecting the drain to enclosed drainage system should be avoided.

Refrigerant lines should be connected from the condensing unit located outside to the fan coil located inside the house. There are instructions provided by the manufacturer that should be adhered to when installing, charging and trapping the condensing unit. The layout of your system should be guided by your size requirements. When installing the plenum duct, it is important that elbows, branch, and tees should be eighteen inches from the fan coil system. To ensure that the drop of pressure will be minimal in the system, you should use minimal elbows and tees.

Create markings of areas where room terminators will be located. Installing room terminators require adhering to unique specifications. The final step involves supply tune installation. The supply tube should be cut to your desired length.




About the Author: